Visian
look out!!!
Took me about 20 seconds to plan the route
8 stops were needed over the 1,050 mile trip and (depending on the model), about 2 hours and 25 minutes were spent charging. I'm betting that's less time than needed with 2 small children and a dog
I have just spent the last month traveling/riding all over the area in that route, but rarely on the interstate. I did not see one Level 2 charge station the entire time. fwiw, I saw maybe 10 Teslas the entire time. Mostly the sedan, one SUV. Dang, those things look nice.
It sure as hell is nice the Tesla has a route planning tool like this, I think that outfit is gonna win.
Can’t wait to see an electric Sprinter!